Increase Biodiversity

Øyer, Flood control

Drone photos of the Trodalen site after completion of the interventions, but before planting is fully completed

Flooding problems  during heavy precipitation in the Trobekken Creek may affect  a development project to establish 220 family housing units.

Through the H2020 project PHUSICOS the Trobekken Creek has been opened and re-meandered.  A buffer zone is established around the re-opened creek and is also combined with a sedimentation dam (check dam).

Capet Forest, Baréges, France: snow avalanches

A) 'Grey' structures in the slope above the access road from the helicopter platform to the construction site for the shelter. B) One of the tripods for protection of new plants. C) Tripods protecting plants in a more barren part of the avalanche release area. Natural forest and old grey structures can be seen in the foreground. D) Example of plant collection where most plants have died, but still enough for the purpose seem to survive

The hazard at the Capet Forest site is from snow avalanches along the 'Midaou' avalanche path. 

Through the H2020 project PHUSICOS afforestation by planted trees of 9 different species have been implemented. The trees will eventually grow high enough and develop a stem thickness to act as effective protection against avalanche release in ca. 20-30 years. 

VALLADOLID (SPAIN) – RE-NATURING URBAN PLAN WITH NbS

The urban dominant model in Spain, which is characterized by the diversification of activities and population increase, has aggravated the urban risks and environmental problems that already existed, such as the high consumption of soil, energy, water, and air pollution. It is also important to highlight the significant difficulties caused by the increase in distances, and the permanent requirement of the use of the car. The strategic line of Valladolid is situated within the frame of the urban city model. Its objectives are to develop an innovative and entrepreneurial culture, and to...

LIVERPOOL (UK) – RE-NATURING URBAN PLAN WITH NbS

Liverpool, as with many major urban areas in the UK and globally, is facing significant challenges in managing its urban form to pursue economic growth agendas, whilst also providing an attractive city for its residents and visitors. Unfortunately, the social, ecological, and economic dimensions of these political mandates are frequently at odds, creating conflicting visions for how urban areas should be being developed and managed. With further densification of urban form, the re-development or conversion of green space into urban land, and a continuing growth spatially of urban...

IZMIR (TURKEY) – RE-NATURING URBAN PLAN WITH NbS

Izmir is a Turkish city with roughly 4 000 000 inhabitants. Located in the west coast of Anatolia, it is the country’s third most populous city. The local climate is Mediterranean, with long and hot summers and relatively mild winters.

Izmir is one of the oldest cities on the Mediterranean sea, with 8500 years of history. It is deeply cultured and offers a variety of historical sites. Izmir is also a modern and dynamic economical centre of its region. The local economy benefits from flourishing service industry followed by manufacturing and agriculture.

With its large...

Retention/sedimentation basin

The sedimentation basin after completion (Photo: ADBS)

The main problem to solve with the implemented NbS measures is the runoff of soil and pollutants from the farmland to irrigation canals and from there to the nearby Lake Massaciuccoli on the Tuscan coast.

Through the H2020 project PHUSICOS sedimentation basin  have been implemented to prevent runoff of soil and pollutants from farmlands. 

Buffer strips along canals in the area of Lake Massaciuccoli

The main problem to solve with the implemented NbS measures is the runoff of soil and pollutants from the farmland to irrigation canals and from there to the nearby Lake Massaciuccoli on the Tuscan coast.

Through the H2020 project PHUSICOS buffer strips have been implemented to prevent runoff of pollutants from farmlands. The strips will also prevent runoff of sediments, which also serve as a flood mitigation measure.

Triple infiltration basin and greenery regeneration in the square of Oblęgorska / Widok Street in Łódź (Poland)

The final look of the ATENAS square. 

An implementation focused on combining blue and green infrastructure, with predominant use of native species and minimizing maintenance effort.

Key aims:

  • demonstrate the integration of blue solutions into green design;
  • create a pilot implementation of the infiltration basin as an example of best practice and a source of know-how;
  • build the trust in NbS;
  • initiate the restoration of water cycle in the Łódka River catchment.

    UNaLab - Drought-resilient orchard, Genoa, Italy

    UNaLab Drought-resilient orchard

    The city of Genoa experiences acute densification and lack of public green spaces, making urban heat stress a pronounced challenge. Air pollution and biodiversity loss are among the other challenges Genova targeted to address through NbS implementation.

    Pages

    Subscribe to Increase Biodiversity