Redland Green School
To build a school that would blend into the surrounding hillside and to ensure that all water would remain on site to prevent flooding of the local drainage system.
To build a school that would blend into the surrounding hillside and to ensure that all water would remain on site to prevent flooding of the local drainage system.
To improve an over wide and heavily silted reach of the river Somer running through Midsomer Norton high street, providing a diverse habitat for native fish, particularly wild brown trout, plants and invertebrates.
To reduce the flood risk, calm traffic and increase community involvement and awareness of sustainable urban drainage systems. To improve water quality in the River Trym.
To regenerate a brownfield site into a vibrant public space and reconnect the city with its waterfront, integrating art and ecology.
Objective of these prototype moss installations was to find out the possible challenges of using moss in different locations and structures. We need to know what type of moss can be used and what are the actual costs of building moss green roofs and walls.
The overall objective is the long-term conservation of Natura 2000 habitats and species of a delta coastal lagoon, by means of an integrated management that exploits, instead to contrast, the dynamism of the lagoon and its constant sedimentary deposit.
The objective of the LIFE-EnviFriendly project was to demonstrate low cost, nature based solutions that if used by all farmers within a watershed it will improve the water quality of the waters significantly. The NbS used in this case was a riparian forest restoration coupled with a river bank erosion protection.
Rapid urbanisation in the Philippines has given rise to many challenges as increasing infrastructure developments contribute to reduced open spaces and increased energy consumption.
Both the public and private construction sectors are responding by reshaping the cityscape and designing building structures that are as environmentally responsive as they are beautiful and compact. Now, buildings should not only be sturdy and spacious, they should also be efficient in energy consumption and adaptive to the changing environment.
LafargeHolcim Philippines (LafargeHolcim) has...
The Park 500 Natural Treatment System (NTS) was constructed as a voluntary effort to provide a low-energy, low-maintenance alternative to reducing nitrogen and phosphorus in the process’s wastewater, which is high in nitrate-nitrogen, organic nitrogen and total phosphorus.
The project was initiated to reduce the environmental footprint of the tobacco production facility and help Philip Morris USA meet its environmental sustainability goals. The NTS reduces mass loading to the James River and creates a performance buffer for the existing plant discharge to ensure long-term...