Case studies tagged with Cost-benefit analysis

Displaying 1 - 3 of 3

GIZ ValuES - Cost-benefit-analysis of the Bala dam proposal, Bolivia

There were plans for a huge dam for hydro-electric energy production, mainly for export. The study was designed as a standard Cost-Benefit Analysis (CBA), including environmental costs and distributional impacts. Cost-benefit-analysis was used to assess the value of the project because it is a widely accepted framework and can combine diverse secondary data about the expected consequences. Despite time pressure and relatively poor data availability, conservative estimates about investment costs, likely returns and environmental damage (along with associated loss of natural assets and...


GIZ ValuES - Rewarding farmers for reducing sedimentation, Indonesia

Removing sediment from reservoirs is an important part of the costs of hydro-power generation. Under the “Rewarding Upland Poor for Environmental Services” project (RUPES), an initiative by ICRAF, upstream farmers changed land-use practices for reducing soil erosion and sedimentation load in streams. The sedimentation rate was used as an indicator to measure the effectiveness of the agreed activities. Monitoring sedimentation rate as an indicator for the positive impact of improving land-use practices made the success of the changes in land-use practices transparent and motivated all...


GIZ ValuES - Combining flood protection and habitat restoration, USA

The area surrounding the confluence of the north and south branches of Thornton Creek (Seattle) experiences storm water-related flooding more often than other areas. A cost-benefit analysis, which incorporated ecosystem services values, aimed at identifying the best cost-benefit ratio among three possible options. The assessment results were intended to inform the decision of the choice of a project option.